Platinum Vein
Produces Platinum Ore
- Category
- Production
- Hit points
- 500
- Construction time
- 10 s
- Size
- 1×1
- Movable
- No
- Tradable
- No
- Building limit
- 3
Produces
| Output | Inputs | Work time |
|---|---|---|
(from deposit) | 50 min |
Produces Platinum Ore
| Output | Inputs | Work time |
|---|---|---|
(from deposit) | 50 min |